Improve Accountability and Transparency In The Administration of Public Funds On Infrastructure Project Through Process Automation: A Case Study Of The Rural Electrification Authority (REA) Contract payment System.

By: Material type: TextTextPublication details: ZCAS UNIVERSITY LUSAKA 2019Description: ii-ix,155pDDC classification:
  • Dissertation
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Books Books ZCAS Dissertation (Browse shelf(Opens below)) Available 20067

It Includes Appendix vii: Detailed Code

There are no comments on this title.

to post a comment.
©2021 - ZCAS